In 2023 the City is Utilizing Archon Construction CO., Inc. to complete three sanitary point repairs on Brookmeade Drive. The locations were identified as part of routine televised inspections that are performed annually to meet MWRD mandates. As part of those inspections, and in an effort to target repairs that coincide with schedule road reconstruction and resurfacing projects, Council earlier this year approved a contract for design and construction engineering services for this work to occur on Brookmeade, where this year’s resurfacing project is scheduled. As reported at that time, the three (3) locations were deemed to have failed with such severity as to render alternative repair methods, including short lining or manhole to manhole lining, as not practical or cost effective. The excavation locations are near 3502, 3600 and 3605 Brookmeade Drive as shown in the map below.
Construction Limits:
See below map
Weekly Project Updates:
The project will begin on June 6th and be completed tentatively by June 14th, 2023.
***This project has been completed and awaiting resurfacing.